GERARD E. LYNCH, Circuit Judge:
For nearly seventeen years, in litigation spanning two continents and numerous courtrooms, a group of Ecuadorian citizens ("Plaintiffs") have sought relief for environmental devastation allegedly caused by defendant-appellee Texaco Petroleum Company's ("TexPet") oil exploration and drilling operations in the Ecuadorian rainforest. In 2001, the district court (Jed S. Rakoff, Judge) dismissed Plaintiffs' initial action on Chevron's forum non conveniens motion, and Plaintiffs refiled their claims in Lago Agrio, Ecuador, where they are currently being litigated.
Recently, Chevron Corporation
Plaintiffs, who are not parties to the arbitration, responded by commencing this proceeding in the district court for a stay of the BIT arbitration, arguing that Chevron's initiation of arbitration against Ecuador breached the promises that Texaco made to the district court in order to secure dismissal of Plaintiffs' original action. Shortly thereafter, Ecuador also moved for a stay. The district court (Leonard B. Sand, Judge) assumed, without deciding, that it had the power to stay BIT arbitration, but declined to exercise that authority in this case. See Republic of Ecuador v. Chevron Corp., Nos. 09 Civ. 9958, 10 Civ. 316, 2010 WL 1028349 (S.D.N.Y. Mar. 16, 2010). Ecuador and Plaintiffs appealed. We conclude that the initiation of BIT arbitration did not breach Chevron's promises to the district court and that the BIT arbitration and the Lago Agrio litigation can coexist without undermining the district court's forum non conveniens dismissal. We therefore affirm the district court's refusal to stay the arbitration.
Prior decisions of both this Court and the district court have thoroughly detailed the factual background and procedural history of this case. See Aguinda v. Texaco, Inc., 303 F.3d 470 (2d Cir.2002); Jota v. Texaco, Inc., 157 F.3d 153 (2d Cir.1998); Republic of Ecuador v. Chevron Texaco Corp., 376 F.Supp.2d 334 (S.D.N.Y.2005); Aguinda v. Texaco, Inc., 142 F.Supp.2d 534 (S.D.N.Y.2001); Aguinda v. Texaco, Inc., 945 F.Supp. 625 (S.D.N.Y.1996). We repeat only those facts necessary to resolve the narrow issue raised in this appeal.
In 1993, residents of Ecuador's Oriente region sued Texaco in the Southern District of New York "seeking extensive relief for vast devastation to that region caused by ... decades of oil exploration and extraction activities." Aguinda, 945 F.Supp. at 626. Plaintiffs alleged that TexPet "improperly dumped ... toxic by-products of the drilling process into the local rivers" and constructed a pipeline that "leaked large quantities of petroleum into the environment," causing both personal injuries
Shortly after that dismissal order, a new government came to power in Ecuador. Political change brought with it a shift in Ecuador's view of this litigation, and the Ecuadorian government attempted to intervene in the lawsuit on Plaintiffs' behalf. However, the district court denied Plaintiffs' then-pending motion for reconsideration and Ecuador's motion to intervene. Jota, 157 F.3d at 155, 158. On appeal, we held that the district court erred by dismissing Plaintiffs' complaint without first securing "a commitment by Texaco to submit to the jurisdiction of the Ecuadoran courts" and remanded for further proceedings. Id. at 159-61, 163.
On remand, Texaco provided that commitment by "unambiguously agree[ing] in writing to be[ ] sued ... in Ecuador, to accept service of process in Ecuador, and to waive ... any statute of limitations-based defenses that may have matured since the filing of the [complaint]." Aguinda, 142 F.Supp.2d at 539. Texaco also offered to satisfy any judgments in Plaintiffs' favor, reserving its right to contest their validity only in the limited circumstances permitted by New York's Recognition of Foreign Country Money Judgments Act.
In September 2009, Chevron initiated BIT arbitration against Ecuador. Chevron's notice of arbitration asserted two claims related to the Lago Agrio litigation. First, Chevron argued that any judgment issued against it would violate the terms of TexPet's previous settlement agreement with Ecuador under which TexPet funded certain environmental remediation projects in exchange for what Chevron now characterizes as a release from liability for environmental impact falling outside the scope of that settlement. Second, Chevron argued that the Ecuadorian government improperly interfered with the Lago Agrio proceedings. In particular, Chevron claimed that "Ecuador's executive branch has publicly announced its support for the plaintiffs, and it has sought ... to interfere with Chevron's defense," and that "Ecuador's judicial branch has conducted the Lago Agrio Litigation in total disregard of Ecuadorian law, international standards of fairness, and Chevron's basic due process and natural justice rights ...."
In the BIT arbitration, Chevron Corporation and TexPet seek (1) a declaration that they "have no liability or responsibility for environmental impact ... or for performing further environmental remediation"; (2) a declaration that Ecuador has breached both the BIT and the terms of its release agreement with TexPet; (3) an order requiring Ecuador to inform the Lago Agrio court that Chevron has "been released from all environmental impact... and that Ecuador and Petroecuador [Ecuador's state-owned oil company] are responsible for any remaining and future remediation work"; (4) a "declaration that Ecuador or Petroecuador is exclusively liable for any judgment that may be issued in the Lago Agrio Litigation"; (5) an order "requiring Ecuador to indemnify, protect and defend [Chevron] in connection with the Lago Agrio Litigation, including payment... of all damages that may be awarded against Chevron"; and (6) attorneys' fees, litigation costs, arbitration costs, "moral damages," and interest.
In December 2009, Ecuador petitioned the district court to stay the BIT arbitration, arguing that Chevron's initiation of arbitration and pursuit of such broad relief violated the promises that Texaco previously made in order to secure a forum non conveniens dismissal of Plaintiffs' action in the United States courts. Shortly thereafter, Plaintiffs moved to stay the arbitration "to the extent it would seek dismissal, nullification or avoidance of any judgment" in the Lago Agrio litigation. The district court (Leonard B. Sand, Judge) refused to stay the arbitration and granted Chevron's motion to dismiss both actions. Republic of Ecuador, 2010 WL 1028349, at *2. Ecuador and Plaintiffs appealed.
During the pendency of this appeal, the parties called our attention to two events that occurred after this case was briefed.
The parties agree that BIT arbitration falls under the United Nations Convention on the Recognition and Enforcement of Foreign Arbitral Awards ("New York Convention"), which governs agreements that are "commercial and ... not entirely between citizens of the United States." Motorola Credit Corp. v. Uzan, 388 F.3d 39, 49 (2d Cir.2004) (internal quotation marks omitted).
Given that strong policy in favor of arbitration, and the lack of express authorization to stay arbitrations under the New York Convention, the FAA, or the BIT, Chevron asserts that courts lack the power to stay BIT arbitration. That is an open question in our Circuit. See Westmoreland Capital Corp. v. Findlay, 100 F.3d 263, 266 n. 3 (2d Cir.1996) ("Because we find that subject matter jurisdiction is lacking, we do not need to decide whether the FAA gives federal courts the power to stay arbitration proceedings."), abrogated on other grounds, Vaden, 129 S.Ct. 1262. Because we conclude that a stay is unnecessary in this case, we need not resolve the question of whether federal courts have the power to stay arbitration under the FAA (or any other authority) in an appropriate case.
Ecuador argues that Chevron, having previously agreed to litigate against Plaintiffs in Lago Agrio, is now "estopped from accepting, ha[s] waived [its] right to accept, or ha[s] otherwise rejected [its]
Ecuador moved to stay the BIT arbitration under the FAA. Section Two of the FAA states that "an agreement in writing to submit to arbitration an existing controversy... shall be valid, irrevocable, and enforceable, save upon such grounds as exist at law or in equity for the revocation of any contract." 9 U.S.C. § 2. That provision constitutes "a congressional declaration of a liberal federal policy favoring arbitration agreements .... The effect ... is to create a body of federal substantive law of arbitrability, applicable to any arbitration agreement within the coverage of the Act." Moses H. Cone Mem. Hosp. v. Mercury Constr. Corp., 460 U.S. 1, 24, 103 S.Ct. 927, 74 L.Ed.2d 765 (1983). The application of state law, especially in a case like this "where there is little connection to the forum[,] ... would introduce a degree of parochialism and uncertainty into international arbitration that would subvert the goal of simplifying and unifying international arbitration law." Smith/Enron Cogeneration Ltd., 198 F.3d at 96. We therefore apply federal law to determine the arbitrability of Ecuador's waiver and estoppel claims.
Under federal law, "arbitration is a matter of contract and a party cannot be required to submit to arbitration any dispute which he has not agreed so to submit." AT & T Techs., Inc. v. Commc'ns Workers of Am., 475 U.S. 643, 648, 106 S.Ct. 1415, 89 L.Ed.2d 648 (1986) (internal quotation marks omitted). Therefore, we must first "resolve[] the question of the very existence of the contract embodying the arbitration clause." Specht v. Netscape Commc'ns Corp., 306 F.3d 17, 26 (2d Cir.2002) (internal quotation marks omitted). Only after ensuring that a valid arbitration agreement exists may we proceed to determine whether that agreement requires the arbitration of Ecuador's claims.
At the outset, we note that Chevron is not a party to the BIT. Unlike the more typical scenario where the agreement to arbitrate is contained in an agreement between the parties to the arbitration, here the BIT merely creates a framework through which foreign investors, such as Chevron, can initiate arbitration against parties to the Treaty. In the end, however, this proves to be a distinction without a difference, since Ecuador, by signing the BIT, and Chevron, by consenting to arbitration, have created a separate binding agreement to arbitrate.
The BIT provides that "an `agreement in writing' for purposes of Article II of the... New York Convention" is created when a foreign company gives notice in writing to a BIT signatory and submits an investment dispute between the parties to binding arbitration in accordance with Article VI of the Treaty. See Bilateral Investment Treaty, art. VI § 4(b). All that is necessary to form an agreement to arbitrate is for one party to be a BIT signatory and the other to consent to arbitration of an investment dispute in accordance with the Treaty's terms. In effect, Ecuador's accession to the Treaty constitutes a standing offer to arbitrate disputes covered by the Treaty; a foreign investor's written demand for arbitration completes
Here, Chevron complied with the requirements of Article VI by notifying Ecuador in writing and submitting the dispute to an arbitral panel "in accordance with the Arbitration Rules of the United Nations Commission on International Trade Law (UNCITRAL)." Id. art. VI § 3(a)(iii). Therefore, the parties formed an "agreement in writing" within the meaning of the New York Convention. Article II of the New York Convention, enforced in the United States through 9 U.S.C. § 201, requires the recognition of "an agreement in writing under which the parties undertake to submit to arbitration all or any differences which have arisen or which may arise between them." Convention on the Recognition and Enforcement of Foreign Arbitral Awards art. II(1), June 10, 1958, 21 U.S.T. 2517. Applying that provision to this case requires us to enforce the parties' agreement according to its terms.
With the existence of a valid arbitration agreement established, we turn to the arbitrability of Ecuador's waiver and estoppel claims. We must determine whether the parties intended for the arbitral panel or the courts to resolve those threshold issues. We will reach the merits of Ecuador's claims only if they are fit for judicial determination.
We address the arbitrability of Ecuador's waiver and estoppel claims "with a healthy regard for the federal policy favoring arbitration." Moses H. Cone, 460 U.S. at 24, 103 S.Ct. 927. That policy "is even stronger in the context of international business transactions" where "arbitral agreements promote[ ] the smooth flow of international transactions by removing the threats and uncertainty of time-consuming and expensive litigation." David L. Threlkeld & Co. v. Metallgesellschaft Ltd., 923 F.2d 245, 248 (2d Cir.1991); see also Mitsubishi Motors Corp. v. Soler Chrysler-Plymouth, Inc., 473 U.S. 614, 631, 105 S.Ct. 3346, 87 L.Ed.2d 444 (1985) (federal policy favoring arbitration applies with "special force in the field of international commerce"). As a result, we resolve "any doubts concerning the scope of arbitrable issues ... in favor of arbitration, whether the problem at hand is the construction of the contract language itself or an allegation of waiver, delay, or a like defense to arbitrability." Moses H. Cone, 460 U.S. at 24-25, 103 S.Ct. 927.
The Supreme Court has "distinguished between `questions of arbitrability,' which are to be resolved by the courts unless the parties have clearly agreed otherwise, and other `gateway matters,' which are presumptively reserved for the arbitrator's resolution." Mulvaney Mech., Inc. v. Sheet Metal Workers Int'l Ass'n, Local 38, 351 F.3d 43, 45 (2d Cir.2003), quoting Howsam v. Dean Witter Reynolds, Inc., 537 U.S. 79, 83-85, 123 S.Ct. 588, 154 L.Ed.2d 491 (2002). "Questions of arbitrability" is a term of art covering "dispute[s] about whether the parties are bound by a given arbitration clause" as well as "disagreement[s] about whether an arbitration clause in a concededly binding contract applies to a particular type of controversy." Howsam, 537 U.S. at 84, 123 S.Ct. 588. Those issues should be decided by the courts unless "there is clear and unmistakable evidence from the arbitration agreement ... that the parties intended that [they] be decided by the arbitrator." Bell v. Cendant Corp., 293 F.3d 563, 566 (2d Cir.2002) (internal quotation marks omitted). On the other hand, "the phrase `question of arbitrability' [is] not applicable ... where parties would likely expect that an arbitrator would decide the gateway matter. Thus procedural questions which grow out of the dispute and
Both waiver and estoppel generally fall into that latter group of issues presumptively for the arbitrator. The Supreme Court has stated, in dicta, that "the presumption is that the arbitrator should decide `allegation[s] of waiver.'" Id. at 84, 123 S.Ct. 588, quoting Moses H. Cone, 460 U.S. at 24-25, 103 S.Ct. 927. Similarly, Howsam favorably quoted the comments to the Revised Uniform Arbitration Act of 2000 for the proposition that, "in the absence of an agreement to the contrary, ... prerequisites such as ... estoppel[] and other conditions precedent to an obligation to arbitrate ... are for the arbitrators to decide." Id. at 85, 123 S.Ct. 588 (internal quotation marks omitted). Furthermore, we have noted that "defenses to arbitrability such as waiver, estoppel, or delay" are "questions properly decided by arbitrators." See Mulvaney Mech., 351 F.3d at 46.
In this case, however, Ecuador characterizes its waiver and estoppel arguments as undermining the agreement itself, not merely as preventing Chevron from taking advantage of an admittedly binding arbitration clause. Ecuador claims that, under such circumstances, waiver and estoppel are presumptively for the courts. We need not reach that issue here because, even assuming Ecuador's waiver and estoppel claims go to Chevron's ability to initiate arbitration, and thus are fairly characterized as "questions of arbitrability," there is "clear and unmistakable evidence" that the parties intended these issues to be decided by the arbitral panel in the first instance. Bell, 293 F.3d at 566 (emphasis removed).
By signing the BIT, Ecuador agreed to resolve investment disputes through arbitration under the UNCITRAL rules. Article 21 of those rules states that the arbitrator "shall have the power to rule on objections that it has no jurisdiction, including any objections with respect to the existence or validity of the ... arbitration agreement." UNCITRAL Arbitration Rules art. 21, para. 1, G.A. Res. 31/98, U.N. Doc. A/RES/31/98 (Dec. 15, 1976).
That conclusion is supported by this Court's interpretation of similar language in other arbitration agreements. Our decision in Contec Corp. v. Remote Solution Co., 398 F.3d 205 (2d Cir.2005), provides an example. There, Contec Corporation initiated arbitration against Remote Solution. Remote Solution insisted that it had never entered into a binding arbitration agreement with Contec Corporation; instead, it claimed to have contracted only with Contec L.P., Contec Corporation's predecessor. Id. at 207. Although Remote Solution's claim went to the validity of the arbitration agreement, we looked to
We then determined that the parties had a "sufficient relationship to each other and to the rights created under the agreement... to permit Contec Corporation to compel arbitration even if, in the end, an arbitrator were to determine that the dispute itself [was] not arbitrable because Contec Corporation [could not] claim rights under the [agreement]." Id. at 209. Importantly, Remote Solution, the party seeking to avoid arbitration, had signed the agreement, which broadly covered the business relationship at issue and delegated questions of arbitrability to the arbitrator. Id. at 209-11. That "indicator of Remote Solution's expectation and intent" enabled us to "conclude that as a signatory to a contract containing an arbitration clause and incorporating by reference the AAA Rules, Remote Solution [could] not ... disown its agreed-to obligation to arbitrate all disputes, including the question of arbitrability." Id. at 211.
Ecuador is now in the same situation. As a signatory to the BIT, Ecuador has consented to arbitrating disputes arising out of investment projects like TexPet's drilling operations in Ecuador. That agreement also incorporated by reference the UNCITRAL rule delegating questions of arbitrability to the arbitral panel through language nearly identical to the AAA provision at issue in Contec. Therefore, Ecuador cannot now "disown its agreed-to obligation to arbitrate ... the question[s] of arbitrability" it has raised as defenses to arbitration in this Court. Id.
Chevron, too, has consented to sending those threshold issues to the arbitrator. It invoked the UNCITRAL rules when filing its notice of arbitration and has argued that questions of arbitrability are for the arbitral panel. Because both parties have consented to having questions of arbitrability, including Ecuador's waiver and estoppel claims, determined by the arbitral panel in the first instance, we do not reach their merits here. Nor can we stay arbitration on those grounds.
Plaintiffs argue that Chevron is using BIT arbitration to undermine the Lago Agrio litigation and deprive them of a forum capable of resolving those claims previously dismissed by the district court on forum non conveniens grounds. According to Plaintiffs, Chevron has breached the promises that Texaco made in order to secure that dismissal by pursuing BIT arbitration, and a stay of the arbitral proceedings is necessary in order to hold Chevron accountable to those promises.
Plaintiffs moved to stay the BIT arbitration on judicial estoppel, equitable estoppel, and collateral estoppel grounds. Although those doctrines have somewhat different purposes and applications, in each case "the party who is to be estopped... must have asserted a fact or claim, or made a promise, that another party relied on, that a court relied on, or that a court adjudicated" and then later attempted to take a contradictory stance in that or another
Plaintiffs' estoppel claims rest on four statements that Texaco made to the district court in order to secure dismissal of Plaintiffs' action. The first three statements concern Texaco's submission to Ecuadorian jurisdiction. In Jota, we made clear that a forum non conveniens dismissal would be appropriate only if Texaco were "to submit to the jurisdiction of the Ecuadoran courts." 157 F.3d at 159. To comply with that ruling, Texaco agreed "to be[ ] sued ... in Ecuador, to accept service of process in Ecuador, and to waive... any statute of limitations-based defenses that may have matured since the filing of [Plaintiffs' complaint]." Aguinda, 142 F.Supp.2d at 539. Those three promises were embodied in the district court's stipulation and order, which both parties signed. See Aguinda v. Texaco, Nos. 93 Civ. 7527, 94 Civ. 9266 (S.D.N.Y. June 21, 2001). Texaco also promised that, if Plaintiffs' claims were dismissed on forum non conveniens grounds, it would "satisfy judgments that might be entered in plaintiffs' favor [by the Ecuadorian courts], subject to [its] rights under New York's Recognition of Foreign Country Money Judgments Act." (Texaco's Mem. of Law in Supp. of Its Renewed Mot. to Dismiss Based on Forum Non Conveniens and International Comity 16-17.) The basic question now before us is whether Chevron's actions in pursuing BIT arbitration constitute a breach of those four promises.
Initially, we note that there is no inherent conflict between BIT arbitration and the Lago Agrio litigation. Those two proceedings involve different parties and distinct claims. BIT arbitration is designed to settle investment disputes between foreign investors and the host government. See Bilateral Investment Treaty, art. VI. It is limited to the resolution of disputes "between a Party [to the BIT] and a national or company of the other Party arising out of or relating to ... an investment agreement between that Party and such national or company... [or] an alleged [breach] of any right conferred or created by [the BIT] with respect to an investment." Id. Chevron's claims are now pending in BIT arbitration precisely because they deal with allegations of Ecuador's improper behavior with respect to Texaco's investment in the region. However, Plaintiffs are not parties to the BIT, and that treaty has no application to their claims; their dispute with Chevron therefore cannot be settled through BIT arbitration. Instead Plaintiffs have exercised their right under the forum non conveniens dismissal to litigate their claims against Chevron in Lago Agrio. That litigation continues to this day. The existence of those parallel proceedings—one in which Chevron asserts wrongdoing on the part of Ecuador and another in which Plaintiffs assert wrongdoing on the part of Chevron— makes clear that the Lago Agrio litigation can coexist with BIT arbitration.
There is also no conflict between Texaco's promises to the district court and Chevron's initiation of a contemporaneous challenge to Ecuador's conduct with respect
The purpose of judicial estoppel "is to protect the integrity of the judicial process by prohibiting parties from deliberately changing positions according to the exigencies of the moment." New Hampshire, 532 U.S. at 749-50, 121 S.Ct. 1808 (internal citations and quotation marks omitted). It prevents a party from asserting a "factual position ... clearly inconsistent" with a position previously advanced by that party and "adopted by ... the court in some manner." Maharaj, 128 F.3d at 98. Because the doctrine is primarily concerned with protecting the judicial process, relief is granted only when "the risk of inconsistent results with its impact on judicial integrity is certain." Simon v. Safelite Glass Corp., 128 F.3d 68, 71-72 (2d Cir.1997); accord DeRosa v. Nat'l Envelope Corp., 595 F.3d 99, 103 (2d Cir.2010); Uzdavines v. Weeks Marine, Inc., 418 F.3d 138, 147-48 (2d Cir.2005).
Chevron's notice of arbitration raised two claims that Plaintiffs assert are contrary to the positions that Texaco took in order to secure the dismissal of Plaintiffs' action on forum non conveniens grounds. Chevron's first claim is that "Ecuador has engaged in a pattern of improper and fundamentally unfair conduct" with respect to the Lago Agrio litigation that has undermined the impartiality of the Ecuadorian courts. Plaintiffs properly characterize that claim as an assertion that "Chevron's due process rights [have been] violated in Ecuador." Texaco, however, reserved its right to challenge any judgment as "rendered under a system which does not provide impartial tribunals or procedures compatible with the requirements of due process of law." N.Y. C.P.L.R. 5304(a)(1). Therefore, Chevron can raise its due process claims in BIT
Chevron's second claim is that a prior agreement between TexPet and Ecuador releases it "from any further liability for environmental impact." According to Chevron, Ecuador has violated that agreement by refusing to "indemnify, protect and defend [Chevron's rights] in connection with the Lago Agrio Litigation" and by failing to accept responsibility for the environmental impact of TexPet's drilling operations. On that basis, Chevron has requested that the arbitral panel issue an "order and award requiring Ecuador to inform the court in the Lago Agrio Litigation that [Chevron] ha[s] been released from all environmental impact" and a declaration that Ecuador "is exclusively liable for any judgment that may be issued in [that] Litigation."
We conclude that Chevron may also raise its release claim in BIT arbitration. As we have previously explained, there is a binding agreement between Chevron and Ecuador to arbitrate investment disputes arising out of TexPet's drilling operations, and Chevron's release claim is related to that activity. If Chevron believes that the terms of the release agreement obligate Ecuador to take certain actions with respect to the Lago Agrio litigation, nothing in Texaco's promises to the district court prevents Chevron from using BIT arbitration to attempt to hold Ecuador accountable to those alleged obligations.
A promise to submit to the jurisdiction of the Ecuadorian courts and to pay a resulting judgment is not incompatible with a request for an arbitral order requiring Ecuador to intervene in the Lago Agrio litigation. In dismissing Plaintiffs' action on forum non conveniens grounds, the district court placed no conditions on Ecuador's right to participate in any litigation instituted by Plaintiffs in Ecuador. Nor could it have, since Ecuador refused to waive its sovereign immunity in the district court and was not a party to Plaintiffs' original action against Texaco. See Aguinda, 142 F.Supp.2d at 542. As a result, nothing that occurred in the United States action limits Ecuador's freedom to take a position in the Lago Agrio litigation in support of either party. Whether that intervention is wholly voluntary or the result of an arbitral order enforcing an alleged prior promise by Ecuador to Chevron to take a particular position in that litigation makes no difference. If such an order is issued, and Ecuador enters the Lago Agrio litigation in support of Chevron, it will still be for the Ecuadorian courts to determine the effect (if any) of such developments on the case pending before them.
Similarly, nothing in Texaco's promises to submit to Ecuadorian jurisdiction and satisfy any Ecuadorian judgment prevents the arbitral panel from issuing a declaration regarding Chevron's liability for TexPet's drilling operations.
A conflict may arise if the Ecuadorian courts do issue a final judgment, and the arbitrators subsequently enter an award that is inconsistent with that judgment. Any such conflict, should it arise, could be resolved in any resulting proceedings to enforce the judgment. In such a proceeding, Plaintiffs would be free to argue that Chevron is estopped from refusing to pay that judgment based solely on the force of its release claim. New York's Recognition of Foreign Country Money Judgments Act, which is the sole reserved route for Chevron to challenge any final judgment resulting from the Lago Agrio litigation, provides only limited ways to attack a judgment based on a prior agreement. Under that Act, a judgment "need not be recognized" if "the proceeding in the foreign court was contrary to an agreement between the parties under which the dispute in question was to be settled otherwise than by proceedings in that court." N.Y. C.P.L.R. 5304(b)(6) (emphasis added). But that provision appears only to apply when the parties to the foreign litigation act contrary to a prior agreement—usually a forum selection clause—between those same parties. See Attorney Gen. of Barb. v. Fitzpatrick Constr. Ltd., No. 87 Civ. 4714, 1988 WL 18871, at *4 (S.D.N.Y. Feb. 22, 1988) (Walker, J.) (limiting application of that provision to situations where parties had previously agreed to litigate the issue in a forum other than the foreign court); see also N.Y. C.P.L.R. 5304 Practice Commentaries (McKinney's 1978) (same). In this case, the prior agreement at issue is the release agreement between Ecuador and TexPet; Plaintiffs were not a party to that agreement.
At this point, however, we need not address the merits of any such argument. Any conflict between the outcomes of the BIT arbitration and the Lago Agrio litigation remains purely hypothetical.
Equitable estoppel is properly invoked "where the enforcement of the rights of one party would work an injustice upon the other party due to the latter's justifiable reliance upon the former's words or conduct." Kosakow, 274 F.3d at 725. "An essential element of [equitable] estoppel is detrimental reliance on the adverse party's misrepresentations." Lyng v. Payne, 476 U.S. 926, 935, 106 S.Ct. 2333, 90 L.Ed.2d 921 (1986). Plaintiffs claim to meet that burden because, in reliance on Texaco's promises to the district court, they "re-fil[ed] their action in Ecuador[] and expend[ed] enormous time and resources prosecuting the case [there] for over seven years." According to Plaintiffs, Chevron has undermined those efforts by pursuing BIT arbitration.
Assuming arguendo that Plaintiffs can show this reliance, they have failed to demonstrate any misrepresentation by Chevron that would justify applying equitable estoppel in this case. As we previously explained, Chevron has thus far honored Texaco's promises to the district court. As long as Chevron's actions remain consistent with those promises, Plaintiffs' equitable estoppel claims should be denied. See Towers Charter & Marine Corp. v. Cadillac Ins. Co., 894 F.2d 516, 522 (2d Cir.1990) (denying equitable estoppel claim where conduct was "consistent with the agreements as written"). If Chevron loses in the arbitration, or prevails based on arguments that it reserved the right to advance, or succeeds in a manner that leads to a final judgment in its favor in the Ecuadorian courts, its initiation of arbitration is consistent with its promises to the district court. To the extent it seeks to use any arbitral award obtained on grounds other than those reserved in its pledge to the district court to block enforcement of any final judgment Plaintiffs may obtain in the Ecuadorian courts, Plaintiffs' claims of equitable estoppel, like their claims of judicial estoppel, can be raised and resolved at that time.
Collateral estoppel bars relitigation of "an issue that has already been fully and fairly litigated in a prior proceeding." Bank of N.Y., 607 F.3d at 918 (emphasis removed). It "applies when (1) the identical issue was raised in a previous proceeding; (2) the issue was actually litigated and decided in the previous proceeding; (3) the party had a full and fair opportunity to litigate the issue; and (4) the resolution of the issue was necessary to support a valid and final judgment on the merits." Id. (internal quotation marks omitted). "If the issues [are] not identical, there is no collateral estoppel." NLRB v. Thalbo Corp., 171 F.3d 102, 109 (2d Cir. 1999).
The application of the collateral estoppel doctrine is improper here because there is no identity of issue between the BIT arbitration and the previous litigation in the district court. While Chevron would be collaterally estopped from relitigating issues already decided by the district court in granting Texaco's motion to dismiss, nothing in the record demonstrates that Chevron has asked the arbitral panel to decide any issues identical to those previously decided by the district
We have considered all of the parties' arguments and have found in them no basis for reversal. For the foregoing reasons, the judgment of the district court is AFFIRMED.
Throughout this Opinion, we use the various corporate names that Chevron Corporation has employed during the course of this litigation only for purposes of clarity. In so doing, we do not attribute any legal significance to the nomenclature used.